Context is not a verdict. Earlier projects remain useful when their original plan, current status and source are kept separate. This page trades storyline for dated records.

Documented regional examples.

Environmental cleanup

Onondaga Lake Superfund site

EPA reports that contaminated-sediment removal was completed in 2014, lake capping in 2016, about 90 acres of wetlands were restored and portions of the site remain in commercial and industrial reuse.

EPA reuse profile ↗
Current public project

Harborview Aquarium

Under construction near Destiny USA, whose original 2001 pitch promised a 90,000 sq ft aquarium that was never built. This one's budget has grown from $85 million to over $100 million, faced a $2 million funding gap as of late October 2025 weeks ahead of its planned July 2026 opening, and part of the overrun is covered by Onondaga Lake remediation (Honeywell settlement) funds.

County project update ↗
Retail / redevelopment

Carousel Center / Destiny USA

The 2001 expansion pitch promised a 90,000 sq ft aquarium, a 500,000 sq ft sports complex and 20,000 hotel rooms (per the original Pyramid Companies pitch deck); what was delivered was a 2.4 million sq ft mall, roughly half the promised footprint, with none of the rest. In 2025 the owner defaulted on the $300 million mortgage tied to the 2014 expansion; the balance has since grown to $325.2 million with deferred interest, alongside multiple 2025 tenant departures.

Destiny USA history ↗
Power-site reuse

Cayuga and Lake Hawkeye

Final 2026 permits reduced the legacy plant's authorized withdrawal and discharge from about 245 MGD to 1 MGD. Company filings separately describe potential future data-center capacity of 400 gross MW and 320 critical IT MW.

DEC final permits ↗
Transportation

I-81 contract ledger

The historic $2.25 billion planning estimate is no longer a sufficient current total. Contract 6 alone is a $2.1 billion award covering Phase 2 work, 25 local streets and water and sewer replacement.

NYSDOT Contract 6 ↗
Connected action

Micron gas corridor

The 16-inch, 16,160-foot gas main is new construction from an existing regulator station to the campus. It is tracked separately from the 345 kV electric service laterals.

DEC application record ↗
Water transmission

White Pine 42-inch mains

OCWA proposes two parallel 42-inch potable-water mains connecting its Eastern Branch service main to White Pine Commerce Park.

DEC application record ↗

Content and source migration record.

The pre-merge homepage contained current additions alongside stale statuses, analysis and advocacy language. The migration record shows what was carried forward, corrected or retired without erasing the earlier state of the research.